Achievements
Public works
|Completion Test of Taipei 101 Building

Public works
|Completion test of Taiwan High-speed Rail Power Supply System

Other projects
Customer name | Engineering project |
---|---|
Taiwan Electric Power Company | Completion inspection of the ninth and tenth power generation projects of Kinmen Tashan Power Plant |
Taiwan Electric Power Company | Penghu Longmen-Talking about the United States and Chikan Wind Turbine new construction project mechanical and Electrical equipment integration test |
Taiwan Electric Power Company | Miaoli Wind Power Dapeng Wind Farm 161kV main transformer station gas switch oil leakage maintenance/161KV main substation additional RTU project |
Taiwan Electric Power Company | Nantun D/S 161kV/23.9kV 60MVA transformer intermediate test |
Taiwan Electric Power Company | Guoan D/S 161kV/23.9 kV/11.95kV 60/30+30MVA transformer intermediate test |
Taiwan Electric Power Company | Toufen D/S 161kV/69kV/11kV 200/200/66MVA transformer intermediate test |
Taiwan Electric Power Company | Completion test of 161kV UHV, high and low voltage electrical equipment of Changbin Power Plant and Fengde Power Plant |
Taiwan Electric Power Company | 161kV GIS AC withstand voltage test of Jiahui Power Plant |
Taiwan Electric Power Company | Shanshan Substation → Fengde Power Plant 161kV line differential current Relay test (ABB REL 550) |
Taiwan Electric Power Company | Guoguang Optoelectronics Factory 345kV GIS AC withstand voltage test |
Taiwan Electric Power Company | 345kV GIS AC withstand voltage test of Mailiao Power Plant |
Taiwan Electric Power Company | Additional fortifications for the 345KV GIS of the Grand View Power Plant, on-site testing and related operations cooperation |
Taiwan Electric Power Company | Changbin Substation → Xingzhang Power Plant 161kV line differential current Relay Test (ABB REL 550) |
Taiwan Electric Power Company | Completion test of high-voltage electrical equipment of Matsu Dongyin Power Plant |
Taiwan Electric Power Company | Tongxiao Power Plant renewal and expansion 345kV switch field monitoring-integrated testing of mechanical and electrical equipment |
Taiwan Electric Power Company | Site completion test of high-voltage electrical equipment for Zhunan offshore wind power Project |
Taiwan Electric Power Company | Xingyuan Power Plant Protection Battery Annual Maintenance and Testing Project |
Taiwan Electric Power Company | AC withstand voltage test of high-voltage power cables of Linkou Power Plant |
Taiwan Electric Power Company | Linkou Power Plant renewal and expansion plan 345kV switch field monitoring protection and auxiliary power equipment and 345/161kV switch field monitoring (SCADA) equipment engineering-integrated testing of mechanical and electrical equipment |
Taiwan Electric Power Company | Dajiaxi Power Plant Qingshan Branch Reconstruction Plan Phase II Power Plant Power Generation Equipment and Ancillary Equipment Project |
Taiwan Electric Power Company | Annual maintenance and testing project of High and low voltage Substation of Hsinchu Leshan Substation |
Taiwan Electric Power Company | Completion test of 161kV and 22kV electrical equipment of Xinxing Electronics Shanying Factory |
Taiwan Electric Power Company | Completion test of Tongyuan wind power generation protection relay and transformer short circuit test |
Taiwan Electric Power Company | Maintenance and inspection of 161kV substation of Miaoli Wind Power Dapeng Wind Farm |
Taiwan Electric Power Company | Wanda Power Plant -4 Generator Set and Factory Electrical Equipment Testing Project |
Taiwan Electric Power Company | Longmen Construction Office Nuclear Fourth Plant-Nuclear Fourth Longmen Construction Office Sewage Plant High-voltage electrical equipment Testing |
Taiwan Electric Power Company | Kinmen Tashan Kirin Branch-Generator Protection Relay Take-up Test |
Taiwan Electric Power Company | Matsu Zhushan Power Plant-Electrical Equipment Completion Test |
Taiwan Electric Power Company | Completion test of the renewal site of the turbid water unit of Mingtan Power Plant |
Taiwan Electric Power Company | Zhoumei-Completion Test of a Power Distribution Substation Project |
Taiwan Electric Power Company | Completion of Changbin Wind Farm Lukang Wind Farm UHV and High voltage Equipment test |
Taiwan Electric Power Company | Nanke Substation →TSMC 6→TSMC 14 → Taiwan Corning → Nanke Substation 161kV loop differential current protection relay completion test (RFL 9300+SEPAM) |
Taiwan Electric Power Company | Taipower Dingyuan Substation →Qunchuang Optoelectronics→Tongbao Optoelectronics→Taipower Dingyuan Substation 161kV loop differential current Protection Relay ring completion test (GRL 100 + GRZ 100) |
Zte Electric | Pingtung Dalian Energy Storage construction project, completion test project of high-voltage equipment |
Zte Electric | Penghu Longmen, Longmen and Dachikan Equipment Engineering Integration Test |
Zte Electric | New turnkey project for waste gas treatment and renovation of other facilities of Muzha Waste Incineration Plant-Protection Relay/Test/Completion/power transmission application |
Zte Electric | Linkou Power Plant renewal and expansion plan 345kV switchyard monitoring protection and auxiliary power equipment and 345/161KV switchyard power monitoring (SCADA) equipment engineering-integrated testing of mechanical and electrical equipment |
Zte Electric | Taichung Power Plant 345-161kV switching field power equipment on-site completion test project |
Zte Electric | Taipower Dajiaxi Power Plant Qingshan Branch Reconstruction Plan Phase II Power Plant Power Generation Equipment and Ancillary Equipment Engineering-Mechanical and Electrical Inspection Engineering |
Zte Electric | Tainan Qigu 161kV booster station and case site integration test and completion test of high-voltage power equipment |
Keelung City Incinerator | Completion test of 69kV UHV electrical equipment for Keelung Incinerator |
Taipei County Incinerator | Taipei County Bali Waste Incineration Plant Cogeneration Symbiosis T R69KV 35000KVA And generator 25,000, etc., high-voltage electrical equipment completion test project |
Pingtung County Incinerator | Pingtung County Kanding Waste Incineration Plant Cogeneration and Electricity Symbiosis TR 69KV 35000KVA And generator 25,000, etc., high-voltage electrical equipment completion test project |
Changhua County Incinerator | Changhua County Xizhou Waste Incineration Plant Cogeneration Symbiosis TR 69KV 35000KVA And generator 25,000, etc., high-voltage electrical equipment completion test project |
Taichung County Incinerator | Houli Waste Incineration Plant in Taichung County, steam-electric symbiosis TR 69KV 35,000 KVA and generator 25,000, etc., high-voltage electrical equipment completion test project |
Muzha Incinerator | Integration test of mechanical and electrical equipment of Muzha Incinerator Renewal turnkey Project of Taipei City Government |
Changhua Incinerator | Inspection of 69kV SF6 gas insulation equipment of Xizhou Incineration Plant in Changhua |
Taichung Thermal Power Plant | Intermediate test of 345kV/18.5kV 650MVA transformer for Taichung Thermal Power Plant |
Academia Sinica | Maintenance inspection and labor procurement case of generator of high-voltage electrical equipment and labor procurement case of Academia Sinica |
Ministry of Defense | Engineering and Production Center of the Armaments Bureau of the Ministry of National Defense-The 202nd Factory of the Armaments Bureau B. Turnkey project for the whole construction of the C-line plant |
Water Conservancy Bureau of New Taipei City Government | Annual maintenance test of electrical Equipment by the Water Conservancy Bureau of the New Taipei City Government |
Customer name | Engineering project |
---|---|
Taipei 101 Building | Completion test of Power Equipment of Taipei 101 Building, Taipei International Financial Building |
TSMC | 15P6 UHV/high voltage/low voltage distribution panel/generator/relay/transformer and other on-site completion tests |
TSMC | 15P6 UHV/high voltage/low voltage distribution panel/generator/relay/transformer and other on-site completion tests |
TSMC | TSMC 12P7 UHV / high voltage / low voltage electrical equipment On-site completion test |
TSMC | Annual inspection of high and low voltage electrical equipment of TSMC's three factories |
TSMC | Annual inspection of high and low voltage electrical equipment of TSMC F3E factory |
TSMC | Completion test of 161kV GIS and other UHV electrical equipment of TSMC Plant 14 |
TSMC | Completion test of 161KV GIS and other UHV electrical equipment of TSMC Plant 12 |
TSMC | 14P4/14P5/14P6/14P7/15P5/15P6/15P7/18P1/18P2/18P3/18P4/18P5/18P6/18P7/18P8/14P8/AP6A/12P8/TCZWM completion test of high and low voltage electrical equipment Semi-annual inspection of electrical equipment and capacitor measurement of F3/F3/F3E/F12P45 factory |
Siemens Energy | Xude Technology 161KV GIS on-site assembly and test engineering |
Siemens Energy | Micron TCP2 factory 161KV GIS installation and testing project |
Siemens Energy | Sanfu Gas Nanke Plant (NK9) 161KV GIS installation and Testing Project |
Force crystal accumulation | 161KV GIS system renovation, maintenance and construction |
Force crystal accumulation | 8A GIS RCP Renewal Project |
Guanghui Electronics | Completion test of Guanghui Electronic high-voltage electrical equipment |
AUO Crystal Material | Completion test project of 161kV UHV electrical equipment of Auo Jingmai Houli Factory |
Lianyou Optoelectronics | Completion of 161kV and other UHV electrical equipment of Lianyou Optoelectronics No. 3 Factory Industrial test |
Dali Optoelectronics | Dali Optoelectronics 161kV GIS electrical equipment Site completion Test |
Winbond Electronics | Winbond Electronics High Voltage Equipment Testing Engineering |
Micron Taiwan | Taiwan Micron-Ruijing-161KV UHV Electrical Annual Fixed Periodic maintenance test |
Qunchuang Optoelectronics | Qunchuang Optoelectronics T2 Factory-UHV and High Voltage Electrical Equipment Year Degree test and maintenance project |
Sun Moon Semiconductor | Completion test of 161kV UHV electrical equipment of Sun Moon Light Semiconductor Zhongli Factory |
AUO Optoelectronics | AUO Optoelectronics L3C Factory-Electromechanical Testing of High-voltage Electrical Equipment |
Chimei Electronics | Chimei Electronics T1 Factory 22.8kV high Voltage protection relay test and high voltage GCB maintenance project |
Giant Technology | Annual maintenance of the power system of the first, second, third and fourth substations and the sixth phase substations of the Giant Technology 69kV First plant Area 1, 2, 3 and 4 substations and the sixth phase substations |
Xinxing Electronics | Xinxing Electronics-Annual Repair and Testing Project of Substation of Xingbang No. 1 Factory |
UMC | UMC 12A 161kV high voltage electrical equipment completion test |
Lijing | Completion test of 85 auxiliary line relay of Lijing Second Factory (HCB+FCB) |
Lijing | Completion test of 161KV GIS and other UHV electrical equipment of Lijing Second Factory |
Rhenium Treasure Technology | Completion test of UHV electrical equipment such as Rhenium Treasure Technology 69kV GIS |
Ministry of Finance | Regular inspection of Electrical Equipment by the Financial Personnel Training Institute of the Ministry of Finance |
Taiwan International Shipyard | Taiwan International Shipbuilding (Kaohsiung Shipyard) 69kV Equipment Replacement and Improvement Project Site completion Test |
Daqi | Completion test of 161kV GIS UHV and high voltage electrical equipment of Daqi Longtan Plant |
Jingshuo Technology | Jingshuo Technology Xinfeng 161kV GIS Electrical Equipment Site Completion Test |
Huatai Electronics | Completion test of UHV and high voltage electrical equipment such as Huatai Electronics 69kV GIS |
Eaton Flying | Replacement of high-voltage main substation on the third floor of Building A and review of high-voltage equipment in Building B by Eaton Feirui |
Taipei Arena | Maintenance and maintenance of power supply system equipment of Taipei Arena |
China Foreign Trade Association | Operation and maintenance of high and low voltage power distribution equipment in Hall 1, Taipei Nangang Exhibition Hall, China Foreign Trade Association |
Yuemei International Development | Yuemei International develops the annual maintenance of UHV and high voltage electrical equipment in the entire region |
Yimei Electric Factory | Taiwan Cogeneration Symbiosis Yimei Automobile Power Plant High-voltage Electrical test Equipment Engineering |
National Two Halls | National Performing Arts Center, National Two Halls-High and Low Voltage Electricity Equipment inspection and maintenance |
Lipeng Enterprise | Lipeng Enterprise Yangmei Factory-69kV Substation UHV Electrical Regular equipment testing |
Industrial Bureau | Nangang Software Industrial Park-Phase II High-voltage Electrical Equipment Set Period safety test project |
Taihua | Field test of protection relay of Taihua Hejing Iron and Steel Plant |
Taihua | Taiwan Chemical Fiber-Mailiao PTA Factory / Longdefeng Second Factory High Completion test of piezoelectric electrical equipment |
Formosa Plastic | On-site completion test after the replacement of the 161kV GIS 111 switch of Formosa Plastics Renwu Public Works Plant |
Xinxing Electronics | Completion test of 161kV and 22kV electrical equipment of Xinxing Electronics Shanying Factory |
Taipei Cultural and Creative | Annual maintenance of electrical equipment for Taipei Cultural and Creative Development |
Industrial Technology Research Institute | Safety Inspection of Power Equipment in Zhongxing Campus, Industrial Technology Research Institute |
Secretariat of Taipei City Government | Maintenance and inspection project of High and low voltage Electrical Equipment of the Secretariat of the Taipei City Government |
Sinosteel | Sinosteel 161kV household Project line differential protection relay site completion test project |
National Palace Museum | Annual maintenance of high-voltage electrical equipment of the National Palace Museum |
Taipei Shilin District Court | Annual regular maintenance project of high-voltage electrical equipment in the Neihu Office Building of the Taipei Shilin District Court and the judges' duty dormitory |
Taiwan CNOOC | Maintenance of electrical equipment of CNOOC-Songshan Aviation Oil Center in Taiwan |
Taiwan CNOOC | Completion test of CNOOC Liquefaction Plant in Taichung Port-High-voltage Electrical Equipment |
Kaohsiung Refinery | High-voltage electrical equipment and maintenance of Kaohsiung Refinery-Gaochang Substation Power protection inspection project |
Sino-US and Chemical Industry | Completion test of 161kV GIS, cogeneration and other UHV electrical equipment of Sino-US and Chemical Taichung Plant, completion test of 161KV GIS, cogeneration and other UHV electrical equipment |
Formosa Plastic | Formosa Plastic Mailiao -161kV GIS AC withstand voltage test Project |
Mitsubishi Heavy Industries | Completion test of 161kV UHV electrical equipment for Mitsubishi Heavy Industries Yilan Lize Incinerator |
Industrial Bureau | Completion test of 69kV UHV and high voltage electrical equipment in Phase II of Nangang Software Park |
Taiwan rich Silk | Completion test of 161kV high-voltage electrical equipment of Taiwan Fuxi Company |
National Chengchi University | Regular inspection of 69kV UHV substation on-duty labor and electrical equipment and infrared thermal development testing |
Academia Sinica | Maintenance inspection and declaration of high-voltage electrical equipment and generators |
Industrial Development Bureau, Ministry of Economic Affairs | Electrical maintenance and maintenance of Xinyi office building |
Customer name | Engineering project |
---|---|
Taipei MRT | Taipei City Government MRT Engineering Bureau-Xinzhuang Airport 161kV Test |
Taipei MRT | Inspection project of Power Supply System of Taipei Mrt Xinsong Line |
Taipei MRT | Harmonic, Electric and Magnetic field measurement and analysis engineering of Power supply system of Taipei Mrt Xinyi Songshan Line |
Taipei MRT | 2 sets of 161kV GIS and TR 50MVA of Yijie UHV substations on the Southern Banan Line, electrical equipment completion test and 22.8kV power supply system electrical characteristic test project |
Taipei MRT | Banan Line-Xinfujie UHV Substation 161kV GIS, TR 50MVA 2 units, etc., Electrical equipment completion test and 22.8kV power supply system, electrical characteristic test project |
Taipei MRT | Electrical characteristic test project of 161kV and 22.8kV power supply system of UHV substation of Tucheng Line |
Taipei MRT | Electrical characteristic test project of 161kV and 22.8kV power supply system of UHV substation of Nangang-Banqiao Line |
Taipei MRT | Completion test project of 2 sets of 161kV TR 60MVA and 22kV high-voltage electrical equipment of Xindian line 161kV TR 60MVA and 22kV high-voltage electrical equipment |
Taipei MRT | Zhonghe line 161kV TR 60MVA 2 units, and 22kV high-voltage electrical equipment completion test project |
Taipei MRT | 2 sets of 161kV TR 60MVA for Tamsui line, and 22kV high-voltage electrical equipment completed test project |
Taipei MRT | Gas insulated switch (161kV GIS) of the main substation of Muzha Line, equipment maintenance and inspection project |
Taipei MRT | Taipei MRT Xinzhuang Luzhou Line-Power Supply System Inspection Project and Harmonic Electric and Magnetic Field Measurement and Analysis Project |
Zhongding Engineering | Taipei Mrt Xinlu Line and Nangang East Extension Power Supply System ETS Installation Acceptance Testing Project Taipei Mrt Xinlu Line Power Supply System Testing Project Taipei MRT Wanda Line Power Supply System Testing Project |
Taipei Loop Line | Completion test of 22kV C-GIS switchgear for Taipei Ring Line engineering |
Taichung Airport MRT | Taichung Metro Jie Electromechanical System Engineering Wuri Wenxin Beitun Line Power Supply System Testing Engineering and Harmonic/Electromagnetic Field Measurement and Analysis |
Taichung MRT | Completion tester of 22kV C-GIS switchgear for Taichung MRT Cheng |
Kaohsiung MRT | Kaohsiung Mrt AC power supply equipment test and maintenance outsourcing work |
Kaohsiung MRT | Kaohsiung MRT (Stock) BSS1, BSS3, BSS5 161kV protection relay and GIS test |
Schneider Electric | Kaohsiung Mrt AC power supply equipment (red/Orange) line annual high voltage inspection Taiwan Railway Building and tunnel (Wanhua~Songshan) High and low voltage power system maintenance project |
Taiwan Railway Administration | Taiwan Railway Administration, Ministry of Communications-Annual Regular Inspection of Electrical Equipment |
Taiwan Railway Administration | Taiwan Railway Machinery Factory Tomioka Base Substation Power cable testing and Formalities for the completion of the Taiwan Telegraph |
Taiwan Railway Administration | Maintenance project of Taiwan Railway building and follow-up road (Wanhua~Songshan) High and low voltage power system |
Taiwan Railway Administration | The Eastern Engineering Office of the Railway Reconstruction Engineering Bureau of the Ministry of Communications; commissioned technical services for interference testing of the tram line system between Luodong and Hualien |
Taoyuan International Airport | Taoyuan International Airport-Phase II Terminal Building Passenger Automatic Tram Transportation System Electrical Equipment Regular Inspection |
Taipei International Airport | Taipei International Airport Power System Inspection Contract |
Taiwan High Speed Rail | Taiwan Shinkansen (High-speed Railway) substation inspection and completion test project 161kV 9 stations 60kV/30kV 20 stations |
Country | Engineering project |
---|---|
Macau | Annual maintenance of 11kV equipment in the new/old plant of Macau Incineration Center |
Vietnam | Field test of protection relay of Taihua Hejing Iron and Steel Plant |
Xiamen | TPK Technology 5th floor switchboard handover test in Zone 1 |
Xiamen | Annual inspection of High voltage Equipment in Power distribution Room of Xiamen Shengming Electronics Co., Ltd. |
Xiamen | Installation and commissioning of South Asia plastic pipe fittings idling speed and high current detection device |
Xiamen | Electrical circuit renovation project on the second floor of Nanya Plastic Dormitory |
Xiamen | South Asia plastic hazardous waste warehouse to add explosion-proof lights and exhaust fans project |
Xiamen | Fuxin Special Steel Plant Plant-wide safety equipment test Project |
Xiamen | Replacement project of chain guide rail of Reclaimer of Houshi Power Plant |
Xiamen | Nanya Plastics Industry (Xiamen) Co., Ltd. Pipe Phase II Power Distribution Project |
Xiamen | Xiamen Nanya No. 1 and No. 2 Air Compressor Electric generator replacement |